Lamlabong Amsipit Solar Facility
311.85 ha
Land area in Barangay Amsipit
300 MWac
Grid export generation rating
60 MW
Integrated BESS capacity (301 MWh)




Grid Interconnection Route
69 kV Line Alignment
Proposed 11.5 km overhead transmission corridor connecting the plant switchyard directly to the regional high-voltage grid node, pending final System Impact Study confirmation.
60 MW BESS Substation
Containerized battery energy storage facility designed for grid frequency regulation, ramp-rate control, and peak generation smoothing.
Pre-Development Authorization Scope
Environmental Baseline Assessments
DOE Pre-Development Scope
Comprehensive terrestrial flora, fauna, and hydrological baseline monitoring active across the 311.85-hectare site boundary.
Authorizes pre-construction environmental baseline surveys, solar irradiance monitoring, geotechnical evaluation, and preliminary engineering design.
NGCP Interconnection Process
Formal System Impact Study (SIS) and Facilities Study submitted to determine optimal connection parameters and transmission allocation.